Every aspect of this project was a challenge. A.G.I. constructed the 30’D X 65’H 304L stainless steel double wall tank at our state of the art fabrication facility in Biggar, SK. Once fabrication was completed transport was arranged from our facility to Southern Saskatchewan, which was a logistical accomplishment due to its sheer size. The final phase of the project included lifting and lowering the tank into an existing concrete tank through a roof opening of an operational plant. All nozzles were then fit and installed on location. Field installation was completed within a two-week time frame during the fall of 2015.